Description
Woodward EasyGen 3500-5: Your Heavy-Duty Generator Brain for Critical Power
You know how generator failures hit hardest during monsoons or heatwaves? That’s where the EasyGen 3500-5 becomes your silent guardian. I’ve seen hospitals in Bangkok and data centers in Texas rely on this controller when grid stability goes sideways. It’s not just a box on the wall—it’s the nervous system that keeps your backup power actually backing you up when it counts.
Why field engineers keep grabbing this model
- Parallel power without headaches – Typically handles 8-unit clusters smoothly. One client in Singapore avoided $200k in downtime last monsoon by syncing four 2MW units through this.
- Gloved-hand touchscreen – That 7-inch display? Works flawlessly with wet gloves during typhoon season. No more fumbling for styluses.
- Modbus TCP that actually works – From my experience, it integrates cleaner with SCADA systems than older models. Saved a mining site 3 weeks of integration hell.
- Self-diagnostics that warn early – Catches fuel pump hiccups before they become blackouts. A hospital in Manila told us it flagged a failing sensor 47 hours pre-failure.
Hard specs you’ll need for procurement
| Spec | Detail |
|---|---|
| Brand/Model | Woodward EasyGen 3500-5 |
| HS Code | 8537.10.00 (Digital control panels) |
| Power Requirements | 90-305 VAC or 24-125 VDC |
| Operating Temp | -25°C to +70°C (tested in Gulf Coast humidity) |
| I/O Capacity | 12 analog inputs, 16 relay outputs (expandable) |
| Installation | DIN rail or panel mount (fits standard 19″ cabinets) |
Where it earns its keep
You’ll find these humming in places where power gaps mean real danger: offshore oil platforms needing seamless switchover during storms, semiconductor fabs where voltage dips scrap $500k wafer batches, or telecom towers keeping 5G alive during wildfires. One thing I appreciate is how it handles voltage dips down to 60% without blinking—critical for those unstable emerging markets.
What your procurement team cares about
Let’s be real—reliability here means avoiding $15k/hour downtime costs. The 365-day warranty covers field failures (not user error, obviously), and Woodward’s tech support actually answers calls before noon EST. In many cases, the parallel sync feature pays for itself by letting you use smaller gensets instead of one massive unit. Oh, and calibration? Takes less than 15 minutes with the built-in wizard.
Keep it running smoothly
Mount it in a NEMA 1 cabinet with at least 4″ clearance top/bottom—those Texas summers get brutal. Always wire the backup battery before monsoon season; I’ve seen too many sites skip this then panic when grid fails. Do quarterly firmware checks (new updates fix CAN bus quirks), and wipe the screen with isopropyl when salt air builds up near coastal sites. One client in Dubai learned the hard way that skipping calibration after 18 months caused load-sharing drift.
Certified for real-world chaos
It’s CE, UL 60950-1, and IEC 61000-6-2 certified—meaning it won’t freak out when lightning hits nearby. RoHS compliant too, so no headaches for your EHS team. The warranty covers parts/labor for 365 days, and in-stock units ship in 1 week (max 4 weeks if custom-configured). Payment’s simple: 50% upfront, balance before FedEx/UPS/DHL dispatch. No nickel-and-diming for firmware licenses.














Reviews
There are no reviews yet.